1. |
IRC:10-1961 |
Recommended Practice for Borrowpits for Road Embankments Constructed by Manual Operation |
40.00 |
10.00 |
2. |
IRC:28-1967 |
Tentative Specifications for the Construction of Stabilised Soil Roads with Soft Aggregate in Areas of Moderate and High Rainfall |
40.00 |
10.00 |
3. |
IRC:33-1969 |
Standard Procedure for Evaluation and Condition Surveys of Stabilised Soil Roads |
24.00 |
10.00 |
4. |
IRC:36-1970 |
Recommended Practice for Construction of Earth Embankments for Road Works |
80.00 |
10.00 |
5. |
IRC:56-1974 |
Recommended Practice for Treatment of Embankment Slopes for Erosion Control |
40.00 |
10.00 |
6. |
IRC:75-1979 |
Guidelines for the Design of High Embankments |
120.00 |
10.00 |
7. |
IRC:SP:58-2001 |
Guidelines for Use of Flyash in Road Embankments |
80.00 |
10.00 |
8. |
MORT&H |
Computer Aided Design System for High Embankment Problems,1993 (with CD) |
500.00 |
30.00 |
9. |
HRB SR No.1, 2000 |
State of the Art: Lime-Soil Stabilization |
100.00 |
10.00 |
10. |
HRB SR No.3, 1999 |
State of the Art: Compaction of Earthwork and Subgrades |
260.00 |
10.00 |
11. |
HRB SR No.13, 1994 |
State of the Art: High Embankments on Soft Ground, Part A – Stage Construction |
140.00 |
10.00 |
12. |
HRB SR No.14, 1994 |
State of the Art: High Embankments on Soft Ground, Part B – Ground Improvement |
140.00 |
10.00 |